Home / Cooling Pipe Modules

Cooling Pipe Modules

Cooling Pipe Modules

Prefabricated welded pipe runs for secondary-side loops, rack distribution, and connection assemblies.

Drawing-based build
Protected delivery

Where it fits

Prefabricated pipework between defined project interfaces.

Cooling pipe modules translate customer routing, end connections, pressure requirements, and packing zones into stainless pipe sections ready for the next integration step.

[01]

Defined routing

  • Pipe modules start from released routes and end interfaces
  • Geometry, bends, and labels should be visible in the package
[02]

Prepared interfaces

  • Flange, weld, thread, hose, or clamp standards are project inputs
  • Pressure, medium, and test protocol stay customer-defined
[03]

Protected delivery

  • Cleaning, capping, labeling, and packing are planned by module group
  • Site routing and commissioning remain outside the module scope

Product family overview

Cooling pipe modules prepared for project handoff.

01 / Released drawing

Released route

OD, wall thickness, spool length, route geometry, and end connections follow the released drawing.

02 / Project-defined

Stainless material

Austenitic stainless tube grade follows the project package.

03 / When specified

Weld process

Weld bead, branch forming, grinding, and fixture control follow the approved drawing and weld requirement.

04 / Clean delivery

Passivation & rinse

Pickling / passivation, DI-water rinse, drying, and protected ends can be included in the handoff package.

05 / Interface control

Clean assembly

Ports stay capped, labels remain visible, and interface protection is planned by module group.

06 / Handoff ready

Packing

Individual labels, protected wrapping, grouped packing, and export crates can be aligned to the delivery plan.

Scope boundary

Customer defines the system. Chelsey fabricates the hardware.

This section keeps the manufacturing scope, interface inputs, and handoff boundary visible without turning the family page into a system-design page.

01

Drawing package

Starts from customer drawings, BOMs, samples, or interface requirements.

02

Interface discipline

Connection standard, material, seals, and component preferences should be confirmed before fabrication.

03

Fabrication support

Stainless fabrication, component integration, cleaning, capping, and labeling stay inside the approved scope.

04

Quality boundary

Test support per customer protocol, packing, and export-ready delivery can be aligned.

Buyer handoff FAQ

Frequently asked questions

01What should be prepared before a product-family review?

Send drawings, BOMs, samples, interface requirements, pressure requirements, component preferences, quantity, and packing destination.

02Does Chelsey define the full cooling system?

No. Chelsey fabricates and integrates hardware within the customer or integrator design package.

03Can customer-specified components be used?

Yes, when the selected valves, quick disconnects, hoses, fittings, or sensors are available and compatible with the approved scope.

04Can testing be included?

Test support per customer protocol, leak review, cleaning, visual inspection, and packing checks can be aligned before delivery.

Send the drawings.We review the build.

Share pipe size, material, pressure, interface type, quantity, fluid medium, customer test protocol, and packing destination for a focused fabrication review.

Drawing / layoutPipe sizeMaterial gradeDesign pressureInterface typeValve requirementTest pressureQuantity
sales@chelseytr.com
+86 180-7217-9517